here are some recent updated on the masjid construction
• The Elevator is currently being installed
• We are working on finishing up the HVAC installation in the main prayer hall
• Re-design of the of the exterior draining currently undergoing
• All interior gas pipes have been installed.
• Waiting for PECO to install the meter and exterior line