Asalamualaikum everyone, here are the current updates on the masjid construction:
HVAC ductwork is complete
Fire sprinkler line connection is complete
Interior install is still ongoing
Exterior trench drain install still being designed
Fire alarm system currently being installed
PECO Gas line is complete, and Verizon FIOS Line is almost fully connected