Asalamualaikum everyone, here are the recent updates on construction:
Window installation has been completed
Electrical rough-ins are 50% completed
The plumbing rough-ins are currently being installed
PECO transformer has been installed
Stucco install is currently ongoing
Rooftop drains have been installed and are currently being connected